Projects
Qubix, Ripponden (February 2008)
This contract was carried out within the private sector and contained reinforced concrete ground beams and pile caps, with holding down bolts being cast in situ.
Kirklees MDC, Fartown (January 2008)
This contract included the provision of two play safe children’s playgrounds, resurfacing of the existing M.U.G.A. facility and re-grading the existing running track and surround footpaths.
Bradford MDC, Height Lane, Oxenhope (December 2007)
The works carried out here was essential due to the existing retaining walls potential collapse. The damaged structure was replaced with a mass concrete retaining wall clad for aesthetic purposes with random stonework.
Calderdale MDC, Jowler Dam (September 2007)
The remediation of Jowler dam was necessary due to severe flooding. This included construction of a gabion mattress to provide a water cascade, which was accompanied by a timber footbridge and reinstatement of the existing public footpath.
Gabion Baskets, Hebden Bridge Road, Haworth (June 1998)
The works where carried out for Nuttalls PLC, in order to coincide with the other construction processes being carried out on the site.