Projects

Qubix, Ripponden (February 2008)
This contract was carried out within the private sector and contained reinforced concrete ground beams and pile caps, with holding down bolts being cast in situ.

qubix2 qubix3 qubix4 qubix1



Kirklees MDC, Fartown (January 2008)
This contract included the provision of two play safe children’s playgrounds, resurfacing of the existing M.U.G.A. facility and re-grading the existing running track and surround footpaths.

fartown3 fartown4 fartown1 fartown2



Bradford MDC, Height Lane, Oxenhope (December 2007)
The works carried out here was essential due to the existing retaining walls potential collapse. The damaged structure was replaced with a mass concrete retaining wall clad for aesthetic purposes with random stonework.

heightlane2 heightlane1 heightlane3 heightlane4



Calderdale MDC, Jowler Dam (September 2007)
The remediation of Jowler dam was necessary due to severe flooding. This included construction of a gabion mattress to provide a water cascade, which was accompanied by a timber footbridge and reinstatement of the existing public footpath.

jowler4 jowler3 jowler2 jowler1



Gabion Baskets, Hebden Bridge Road, Haworth (June 1998)
The works where carried out for Nuttalls PLC, in order to coincide with the other construction processes being carried out on the site.

gabion1 gabion2 gabion3 gabion4

  • Ground works
  • Structural retaining
  • Earthworks
  • Demolition
  • Graded crushed hardcore
  • Road planings

Unit 12 , Station Road Industrial Park
Station Road
Luddendenfoot
Halifax
West Yorkshire
HX2 6AD

Tel: 01422 886688
Fax: 01422 886876
Email: info@thejaggergroup.co.uk

Home Projects Design by Fab Spider